River Basin: Athabasca

   

Distance & Gradient:

   223km Hwy 63 bridge to Fort Chip via Mamawi Lake, .2m/km

   279km Snye to Fort Chip via Mamawi Lake

   299km Snye to Fort Chip via Embaras River and Lake Athabasca

Days: Aim for 6-8 as being wind bound could be an issue (We did it in 4 via Mamawi Cr and Mamawi Lake)

            Day 1 July 11 - 60km

Day 2 July 12 - 63km

Day 3 July 13 - 70km

Day 4 July 14 - 33km

Flow: Athabasca River Level at Ft.McMurray

   High = 1200 m3/s

   Medium = 800 m3/s

   Low = 400 m3/s

   Not recommended for paddling

        above 1500m3/s and below 200m3/s

Maps:

    1:250,000 74D Waterways

    1:250,000 74E Bitumount

    1:250,000 74L Fort Chipewyan

Classification:

   River=Class I

   Rapids=None

    Skill= Intermediate Open Canadian

Access & Egress:

    Start The Snye

    Access: "Bridge to Nowhere"

    Access: Ft. McKay

    Access: Shell Landing

    Finish Ft. Chip

Description:

   Wide shallow, islands, exposed to wind

Historical:

  There were trading posts along the river

Wildlife:

Trip Report:

GPS Locations:

Pictures:Ft.Chipewyan by Winter Road

Ft.McMurray

0

0

Bridge to Nowhere

56

56

Ft.McKay

5

61

Bitumount

25

86

Embarras

104

190

Old Fort

29

219

Embarras River

 

 

Embarras into Lake

 

 

Around west to Ft.Chip